Free Tool

Sanitary Survey Prep Checklist

Surveyors decide a lot in the first thirty minutes — mostly from your records. Print this, work through it before your survey window, and the visit becomes a walkthrough instead of an interrogation.

Free. No account needed.
Sanitary Survey Preparation Checklist

System:  

PWSID:     Survey expected:     Prepared by:  

1. Records binder — what the surveyor will ask for

RecordWhere it is / status
Bacteriological Sample Siting Plan (current, matches actual practice)
Monitoring results, last 3 years (coliform, chem, lead & copper, DBPs)
State-issued monitoring schedule (current year)
Operator certification(s) — grade and expiration
Last sanitary survey letter + evidence every deficiency was corrected
Consumer Confidence Reports + delivery certifications (CWS)
Lead service line inventory as filed with the state
Emergency Response / Notification Plan (current contacts)
Cross-connection control program records / backflow test reports
Public notices issued (if any) + certifications to state
Well logs / source construction records
Pressure complaints or outage log

2. Facility walkthrough — what they physically check

ItemNotes
Wellhead: sealed sanitary cap, screened vent, sloped concrete pad, no ponding
Well setbacks: no chemical storage, septic, or animal enclosures nearby
Storage tanks: locked hatches with gaskets, screened vents & overflows (#24 mesh), no corrosion holes
Tank interior inspection records (many states expect ~5-year cycles)
Chlorination: chemical feed working, residual test kit on hand, reagents not expired
Sample taps: smooth-nosed, clean, not near contamination sources
Cross-connections: hose bibs with vacuum breakers, no unprotected connections
Pressure: system maintains >20 psi at all points under normal demand
Electrical/controls: panels labeled, alarms functional, generator exercised
Site security: fencing, locks, no vandalism evidence

3. The five most-cited deficiency areas

  1. Open items from the last survey — the #1 escalation trigger. Close them with photos and invoices.
  2. Sample siting plan mismatch — plan says one thing, sampling does another.
  3. Storage tank screens and hatches — missing vent screens and unsealed hatches.
  4. Operator certification gaps — expired certs or grade below system classification.
  5. Recordkeeping — results exist at the lab but not in your files. Surveyors cite what they cannot see.
A surveyor who finds a significant deficiency starts a corrective-action clock — typically 120 days or a state-set schedule. Fixing these items before the visit is cheaper than fixing them on a deadline.

Generated with Orevant (orevant.com/tools/survey-prep). General guidance — your state's survey form governs.